Set-Aside BriefFederal contracts for small business

Unofficial. Not affiliated with SAM.gov or the U.S. government. Data from SAM.gov (public). Registration in SAM.gov is free — never pay anyone to register.

Total vs Partial Small Business Set Aside: 2026 Checklist

By Aoba Works · Published · 18 min read

How this guide was made: drafted with AI assistance from the official sources linked below, then passed an automated editorial check before publishing. Our process

A total small business set-aside reserves the whole contract for small businesses, so large companies can't bid at all. A partial small business set-aside splits the requirement into two parts. One part is reserved for small businesses, and the other part is open to everyone, large firms included. Your bid strategy depends on which part you can win and how much of the work you can do with your own staff. Under the subcontracting limits, a services prime can pay non-similarly situated subcontractors no more than 50% of what the government pays it (FAR 52.219-14).

One thing that often confuses people: current FAR text gives small businesses no general price evaluation preference on partial set-asides. The only small-business price preference in FAR Part 19 is the 10% HUBZone preference, and it applies in full and open competition (FAR 19.1307). The sections below show what this means for your bid.

Which option is right for you?

Start with the notice type that matches where your business is now, then open the official page listed in the table.

Which option is right for you?. Source: SAM.gov
Your situationWhat to pick firstFirst page to open
Beginner, first federal bid, no certificationsTotal Small Business Set-Aside (code SBA). Only small firms compete, and self-certification in SAM.gov is enoughSAM.gov Contract Opportunities filtered by Set Aside
You already deliver this work every day and can do most of it with your own staffBoth types. On a partial set-aside, bid on both portions if the solicitation allows itThe solicitation's Section B line items and the Notice of Partial Small Business Set-Aside clause, FAR 52.219-7
Tight budget and a small team that will need subcontractorsA total set-aside where your share of the work clears the 50%/85%/75% limit, or a partial set-aside where the reserved portion is small enough to staff yourselfFAR 52.219-14, Limitations on Subcontracting
Certified HUBZone firmUnrestricted competitions and the non-set-aside portion of partial set-asides, where the 10% preference can helpFAR 19.1307
Not sure you're "small" for this jobCheck your size first and don't bid yetSBA Size Standards Tool

Here's why. Total set-asides are the simplest place to start because the competition and the rules are uniform across the whole contract. Partial set-asides reward firms that can scale, since you can win the reserved portion, the open portion, or both. Your subcontracting math decides whether either one is realistic for you.

A note on FAR section numbers in 2026

Older articles say "FAR 19.502-2" and "FAR 19.502-3". You'll now also see "19.104-1" and "19.104-2", and the reason is the FAR overhaul. The codified FAR on acquisition.gov still contains subpart 19.5. Under the Revolutionary FAR Overhaul, though, agencies have issued class deviations that move total set-aside rules to 19.104-1 and combine both kinds of partial set-aside rules into 19.104-2 (Acquisition.gov FAR Overhaul Part 19; NASA deviation memo). As of October 2026, formal rulemaking for Part 19 had not been finalized (Lohfeld Consulting). The substance is largely the same. Always cite the clause numbers printed in your solicitation.

What Is a Total Small Business Set-Aside? (FAR 19.5 Definition)

A total set-aside reserves the entire acquisition for small businesses when the rule of two is met, and no large business can compete. In the rule of two, the contracting officer expects at least two responsible small businesses to submit offers that are competitive on fair market price, quality and delivery (FAR 19.502-2).

The codified rule has two dollar tiers:

As of October 2026, the micro-purchase threshold is $15,000 and the SAT is $350,000. Both were raised on , from $10,000 and $250,000 (Pillsbury summary of the FAR inflation adjustment; check the FAR 2.101 definitions for current values). The overhaul version states the rule as applying to contracts "above the micro-purchase threshold" (FAR Overhaul Part 19).

Example (illustrative): an agency needs janitorial services for one building for $600,000 a year. Market research turns up five small janitorial firms that had similar contracts. The CO sets the whole requirement aside. On SAM.gov the notice shows "Total Small Business Set-Aside (FAR 19.5)", which is set-aside code SBA in the SAM.gov Opportunities API.

Pitfalls and fixes

What Is a Partial Small Business Set-Aside?

A partial set-aside reserves one or more distinct portions of a requirement for small businesses and leaves the rest open to all offerors. COs use it when a total set-aside isn't appropriate but part of the work still passes the rule of two (FAR 19.502-3).

Under codified FAR 19.502-3(a), the CO shall partially set aside when all of the following are true:

  1. Market research shows a total set-aside isn't appropriate.
  2. The requirement can be split into distinct portions.
  3. The acquisition isn't using simplified acquisition procedures.
  4. Two or more responsible small businesses are reasonably expected to offer competitively on the set-aside portion.
  5. The program eligibility requirements apply.
  6. The result won't be a multiple-award contract. Multiple-award partial set-asides were in 19.502-4 and are now combined into 19.104-2 under the overhaul.

The codified text also excludes construction from partial set-asides (FAR 19.502-3). The solicitation has to say which portions are set aside and which aren't, and how to submit offers for each one (FAR 19.502-3(b)–(c)).

Example (illustrative): a supply solicitation has 10 contract line items (CLINs). CLINs 0001–0006 are high-volume items that only a few large manufacturers can supply at scale. CLINs 0007–0010 are low-volume items that several small distributors already sell. The CO might leave 0001–0006 unrestricted and set aside 0007–0010. On SAM.gov the notice appears as "Partial Small Business Set-Aside (FAR 19.5)", code SBP (SAM.gov Opportunities API).

Pitfalls and fixes

Total vs Partial Set-Aside: Side-by-Side Comparison

The main differences are who can compete on each part, how the requirement is divided, and which rules your offer must meet. This table shows them side by side.

Total vs Partial Set-Aside: Side-by-Side Comparison. Source: SAM.gov
FeatureTotal small business set-asidePartial small business set-aside
Who can bidSmall businesses only, on everythingSmall businesses only on the reserved portion; anyone on the non-reserved portion
SAM.gov label / codeTotal Small Business Set-Aside (FAR 19.5) / SBAPartial Small Business Set-Aside (FAR 19.5) / SBP
TriggerRule of two for the whole acquisitionTotal set-aside not appropriate, requirement divisible, rule of two for the reserved portion
Dollar rangeAbove $15,000 micro-purchase threshold (as of Oct 2026)Not used under simplified acquisition procedures (codified 19.502-3(a)(3))
ConstructionAllowedExcluded in codified FAR 19.502-3(a)
Large firm offer on the reserved partNot allowedRejected as nonresponsive on the set-aside portion
Limitations on subcontracting (52.219-14)Applies when the contract exceeds the SAT, per the FAR clause prescriptionApplies when any set-aside portion exceeds the SAT (FAR Overhaul Part 19)
HUBZone 10% preferenceNot applicable (not full and open)Can matter on the non-reserved, full-and-open portion; check the clauses
What happens if no acceptable small offers arriveWithdraw and resolicit unrestricted (at or below SAT)Depends on the solicitation; the CO can withdraw the set-aside (FAR 19.506)

Sources for the rows: FAR 19.502-2, FAR 19.502-3, FAR 52.219-7, FAR 19.1307.

What Is the 51% Rule for Small Business Set-Asides?

The "51% rule" is an old nickname. Today's rule caps how much of the contract money you can pay to subcontractors that aren't similarly situated. For services and supplies the cap is 50% (13 CFR 125.6; FAR 52.219-14, Oct 2022 version).

The rule measures money paid out, not hours worked. The current limits are:

What Is the 51% Rule for Small Business Set-Asides?. Source: SAM.gov
Contract typeMaximum you may pay to non-similarly situated subcontractorsWhat's excluded from the calculation
Services (except construction)50% of the amount the government pays youSome other direct costs, such as airline travel or cloud computing, when they aren't the main purpose of the buy (13 CFR 125.6)
Supplies / products50%Cost of materials
General construction85%Cost of materials
Special trade construction75%Cost of materials

A similarly situated entity is a first-tier subcontractor that has the same small business program status as you and is small under the NAICS code assigned to the subcontract. Work it performs with its own employees doesn't count against your cap (FAR 52.219-14).

Example (illustrative): you win a $1,000,000 total small business set-aside for IT help desk services. You plan to pay $300,000 to a large company for tier-2 support and $250,000 to another small business for on-site staff. Only the $300,000 counts toward the cap, so you're at 30%, well under 50%. Now suppose the "small" partner is actually large under the subcontract's NAICS code. Then you're at 55%, and you're out of compliance.

Compliance is generally measured over the base term and then over each option period separately (13 CFR 125.6(c)). The penalty is steep: the greater of $500,000 or the amount paid to subcontractors above the allowed level (13 CFR 125.6).

Pitfalls and fixes

How Does the Rule of Two Determine Which Set-Aside Applies?

The contracting officer runs market research to see whether two or more responsible small businesses can perform at a fair price. That result decides whether the buy is a total set-aside, a partial set-aside, or unrestricted (FAR 19.502-2; FAR Overhaul 19.104-1).

From the CO's side, the decision usually goes like this:

  1. Market research. The CO reviews past awards, searches SAM.gov entity data, and often posts a Sources Sought or RFI notice on SAM.gov.
  2. Rule of two for the whole requirement. If two or more capable small businesses are expected to offer, the result is a total set-aside. The overhaul text keeps this as a "must."
  3. If that fails, check for divisible portions. If some portions pass the rule of two and the codified 19.502-3 conditions are met (not construction, not simplified procedures), the result is a partial set-aside.
  4. If nothing passes, the buy goes unrestricted, and the CO documents why it wasn't set aside. SAM.gov may label it "No Set aside used". SBA can recommend a set-aside, and a CO who rejects that recommendation has to follow a set procedure (FAR Overhaul Part 19).

What this means for you: step 1 is where you can affect the outcome. If you answer a Sources Sought notice with a clear capability statement showing relevant past performance, you become one of the "two" the CO is counting. A short, specific response does more than a brochure. The capability statement example guide covers the five sections buyers read first.

Pitfalls and fixes

What Is the Price Evaluation Preference in Partial Set-Asides?

Current FAR text gives small businesses no general price evaluation preference on either portion of a partial set-aside. Small offers on the set-aside portion compete only against other small offers. The only Part 19 price preference is the 10% HUBZone factor, and it applies in full and open competition (FAR 52.219-7; FAR 19.1307).

Some guides say small businesses get a price adjustment on the open portion of a partial set-aside. The official text doesn't support that. Here's what does apply:

Example (illustrative), HUBZone on the open portion: a HUBZone firm offers $100,000 on the open CLINs. A large business offers $95,000. For evaluation only, the large offer becomes $95,000 × 1.10 = $104,500, so the HUBZone offer is evaluated as lower. If the evaluated prices tie, FAR 19.1307 says the HUBZone small business gets the award.

If you aren't HUBZone-certified, plan on competing purely on price and technical merit for the open portion. Don't price as though you'll get a discount that doesn't exist.

How to Decide Your Bid Strategy: Total vs Partial Set-Aside Checklist

Before you bid, confirm the set-aside type, your size under the assigned NAICS code, and whether your self-performance clears the subcontracting cap. Then decide which portions to price.

Step-by-step on SAM.gov

  1. Go to SAM.gov and choose Search, then the Contract Opportunities domain.
  2. In Filters, open Set Aside and select Total Small Business Set-Aside (FAR 19.5) and/or Partial Small Business Set-Aside (FAR 19.5). Add your codes under NAICS Code.
  3. Open a notice. In General Information, check Contract Opportunity Type: is it a Sources Sought, a Presolicitation, or a Solicitation? In Classification, check the Set Aside and NAICS Code fields.
  4. Open the SBA Size Standards Tool, enter that NAICS code, and confirm you're under the receipts or employee limit, counting affiliates.
  5. Download the solicitation attachments. For a partial set-aside, find the CLINs marked set aside and not set aside, plus the submission instructions (FAR 19.502-3(b)–(c)).
  6. Search the document for "52.219-14" and "52.219-7". Note which clause dates are cited and whether any "(DEVIATION)" labels appear.
  7. Build a subcontracting worksheet that lists every planned sub, marks each one similarly situated or not, and shows the dollars paid per period. Confirm you stay under 50%, 85% or 75%.
  8. Choose your play using the decision checklist below.

Decision checklist

Common mistakes and fixes

Common mistakes and fixes. Source: SAM.gov
MistakeFix
Bidding under your company's "usual" NAICS codeSize is judged against the NAICS code in the solicitation (13 CFR 121.404)
Counting a teammate's hours instead of dollars paidThe limit is based on the amount the government pays you (FAR 52.219-14)
Missing a size protest window against a competitorFive business days after you're notified of the apparent awardee in negotiated buys (13 CFR 121.1004)
Expecting a small business price discount on partial set-asidesOnly the HUBZone preference exists, in full and open competition (FAR 19.1307)

Can a Large Business Bid on a Partial Set-Aside?

Yes, but only on the non-reserved portion. A large business's offer on the reserved portion is treated as nonresponsive and rejected (FAR 19.502-3(d)).

Before rejecting an otherwise eligible offer over a question about the offeror's size, the CO has to get an SBA size determination (FAR 19.502-3(d)). For small bidders, this means a large competitor can win the open CLINs while you win the reserved ones. The government may then manage two contractors on related work.

Example (illustrative): on the 10-CLIN supply buy above, a large manufacturer wins CLINs 0001–0006 and a small distributor wins CLINs 0007–0010. The large firm would have been rejected if it had offered on 0007–0010.

Pitfalls and fixes

Next steps

You can do the first three steps today on your own. If you'd like help, there are free options and paid ones.

Do it yourself today:

  1. Save a SAM.gov search with Set Aside filtered to SBA and SBP and your two or three main NAICS codes.
  2. Run the SBA Size Standards Tool for each of those NAICS codes and write down where you stand against each limit.
  3. Make a one-page subcontracting worksheet template with columns for subcontractor, similarly situated (Y/N), dollars per base or option period, and percent of the total. Reuse it on every bid.

If you'd rather not do it alone:

Related guide on this site:

FAQ

What happens if a small business fails the rule of two after award?

The rule of two is the CO's expectation before the solicitation goes out, so it isn't retested after award. What matters after award is your size as of the date of your initial offer with price, and that generally holds for the life of the contract (13 CFR 121.404). If too few acceptable small business offers come in before award, the CO can withdraw the set-aside and resolicit it (FAR 19.502-2).

Can a set-aside be challenged or protested?

Yes. You can challenge the set-aside decision itself at GAO as a solicitation problem, and you must file before the closing date (4 CFR 21.2(a)(1)). You can also challenge a competitor's size by filing a size protest with the CO within five business days after you're notified of the apparent awardee in a negotiated procurement (13 CFR 121.1004).

Does a partial set-aside count as two separate contracts?

Not necessarily. It's one solicitation with portions that are set aside and portions that aren't, and depending on who wins, it can produce one award or several. FAR 52.219-7 lets offerors submit separate offers for each portion or one combined offer (FAR 52.219-7). The solicitation's instructions decide how the portions are evaluated and awarded.

What size standard applies to determine small business status?

The SBA size standard for the NAICS code the CO assigned to that solicitation applies. Depending on the industry, it's measured by average annual receipts or by number of employees, and it includes affiliates (SBA size standards). You must meet it on the date you submit your initial offer with price (13 CFR 121.404).

Sources

Spotted something out of date or wrong? Tell us at shigoto.ai.note@gmail.com. Guides are re-checked against official sources on a rolling schedule.